Buildings Applications Register

Gold Coast Airport is committed to driving sustainable investment and regional development through well-managed infrastructure growth. All land use planning and building works at the airport fall under the Airports Act 1996 and the Airports (Building Control) Regulations 2025. Any building activity must be approved by the Airport Building Controller (ABC).

 

To guide stakeholders and investors, we’ve developed clear Development Guidelines aligned with the airport’s Master Plan, outlining application processes and planning objectives for future development.

Reference Number: BAN-26-OOL-1733

INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (SECTION 30)

Name of Applicant:

Ampol Petroleum PTY LTD

Description of Proposed Activity:

Installation Generator Shelter over the site back up generator

Location of Proposed Activity:

Lot 305, Gold Coast Airport Gold Coast Airport JUHI

If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:

N/A

If GCAPL is not the applicant, Date on which GCAPL received Application:

19/08/2026

INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (SECTION 31)

Date on which GCAPL made its determination:

N/A

How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):

TBC

Date on which the ABC made its determination / Date on which application withdrawn:

TBC

Reference Number: BAN-26-OOL-1729

INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (SECTION 30)

Name of Applicant:

Queensland Airports Ltd

Description of Proposed Activity:

JUHI Fuel Pipe Decommissioning

Location of Proposed Activity:

Eastern Avenue, Bilinga - Gold Coast Airport. Former JUHI site.

If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:

TBC

If GCAPL is not the applicant, Date on which GCAPL received Application:

N/A

INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (SECTION 31)

Date on which GCAPL made its determination:

TBC

How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):

TBC

Date on which the ABC made its determination / Date on which application withdrawn:

TBC

Reference Number: BAN-26-OOL-1715

INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (SECTION 30)

Name of Applicant:

Queensland Airports Ltd

Description of Proposed Activity:

GCA AHU Upgrade Stage 3

Location of Proposed Activity:

Gold Coast Airport Main Terminal

If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:

25/06/2026

If GCAPL is not the applicant, Date on which GCAPL received Application:

N/A

INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (SECTION 31)

Date on which GCAPL made its determination:

25/06/2026

How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):

Approval

Date on which the ABC made its determination / Date on which application withdrawn:

11/08/2026

Reference Number: BAN-26-OOL-0031

INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (SECTION 30)

Name of Applicant:

Queensland Airports Ltd

Description of Proposed Activity:

1 - BP - Stage 1 scope of minor refurb works Hanger 20

Location of Proposed Activity:

Gold Coast Airport Hanger 20, Lores Bonney Circuit, Bilinga QLD 4225

If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:

15/04/2026

If GCAPL is not the applicant, Date on which GCAPL received Application:

N/A

INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (SECTION 31)

Date on which GCAPL made its determination:

15/04/2026

How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):

Approval

Date on which the ABC made its determination / Date on which application withdrawn:

6/07/2026

Reference Number: BAN-26-OOL-0030

INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (SECTION 30)

Name of Applicant:

MNR Constructions

Description of Proposed Activity:

1 - BP - Brooki Bakehouse Temporary Kiosk

Location of Proposed Activity:

Terminal 1 - Retail Kiosk (Site 74)

If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:

N/A

If GCAPL is not the applicant, Date on which GCAPL received Application:

13/04/2026

INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (SECTION 31)

Date on which GCAPL made its determination:

N/A

How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):

Approval

Date on which the ABC made its determination / Date on which application withdrawn:

13/05/2026

Reference Number: BAN-26-OOL-0029

INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (SECTION 30)

Name of Applicant:

Trazboard Pty Ltd

Description of Proposed Activity:

Economy Car Rentals - Demolition of building, fencing and associated infrastructure for end of lease

Location of Proposed Activity:

Lot 401A, Cnr Terminal & Tom Norris

If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:

N/A

If GCAPL is not the applicant, Date on which GCAPL received Application:

10/04/2026

INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (SECTION 31)

Date on which GCAPL made its determination:

N/A

How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):

Consent

Date on which the ABC made its determination / Date on which application withdrawn:

25/06/2026

Reference Number: BAN-26-OOL-0028

INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (SECTION 30)

Name of Applicant:

GREATER GROUP PTY LTD

Description of Proposed Activity:

1 - BP - Avis & Budget Car Rentals Tenancy Refurb Works

Location of Proposed Activity:

Avis Tenancy /Domestic Terminal

If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:

N/A

If GCAPL is not the applicant, Date on which GCAPL received Application:

17/04/2026

INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (SECTION 31)

Date on which GCAPL made its determination:

N/A

How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):

Approval

Date on which the ABC made its determination / Date on which application withdrawn:

8/05/2026

Reference Number: BAN-26-OOL-0025

INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (SECTION 30)

Name of Applicant:

OPEC Pty Ltd

Description of Proposed Activity:

BP - Stage 1 - ARFF Station - Construct Storage of the Boat shed

Location of Proposed Activity:

ARFF Station

If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:

N/A

If GCAPL is not the applicant, Date on which GCAPL received Application:

21/04/2026

INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (SECTION 31)

Date on which GCAPL made its determination:

N/A

How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):

Approval

Date on which the ABC made its determination / Date on which application withdrawn:

9/06/2026

Reference Number: BAN-25-OOL-0057 Stage 3

INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (SECTION 30)

Name of Applicant:

SHAPE AUSTRALIA (QLD) PTY LIMITED

Description of Proposed Activity:

Stage 3 - BP - Northern Bays Upgrade Package 3 - External Cladding Extent Update

Location of Proposed Activity:

Northern Bays - Old International Airport

If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:

N/A

If GCAPL is not the applicant, Date on which GCAPL received Application:

10/10/2025

INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (SECTION 31)

Date on which GCAPL made its determination:

N/A

How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):

Approval

Date on which the ABC made its determination / Date on which application withdrawn:

08/05/2026

Reference Number: BAN-25-OOL-0057 Stage 2

INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (SECTION 30)

Name of Applicant:

SHAPE AUSTRALIA (QLD) PTY LIMITED

Description of Proposed Activity:

Stage 2 - BP - Northern Bays Upgrade Package 2

Location of Proposed Activity:

Northern Bays - Old International Airport

If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:

N/A

If GCAPL is not the applicant, Date on which GCAPL received Application:

10/10/2025

INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (SECTION 31)

Date on which GCAPL made its determination:

N/A

How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):

Approval

Date on which the ABC made its determination / Date on which application withdrawn:

02/04/2026

Reference Number: BAN-25-OOL-0057 Stage 1

INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (SECTION 30)

Name of Applicant:

SHAPE AUSTRALIA (QLD) PTY LIMITED

Description of Proposed Activity:

Stage 1 - BP - Northern Bays Early Works Package 1

Location of Proposed Activity:

Northern Bays - Old International Airport

If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:

N/A

If GCAPL is not the applicant, Date on which GCAPL received Application:

10/10/2025

INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (SECTION 31)

Date on which GCAPL made its determination:

N/A

How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):

Approval

Date on which the ABC made its determination / Date on which application withdrawn:

17/02/2026

Reference Number: BAN-25-OOL-0056

INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (SECTION 30)

Name of Applicant:

SHAPE AUSTRALIA (QLD) PTY LIMITED

Description of Proposed Activity:

Northern Bays - Demolition Works - 1 - Stage 1 - BP - Demolition Works

Location of Proposed Activity:

Northern Bays - Demolition Works

If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:

N/A

If GCAPL is not the applicant, Date on which GCAPL received Application:

10/05/2025

INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (SECTION 31)

Date on which GCAPL made its determination:

N/A

How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):

Approval

Date on which the ABC made its determination / Date on which application withdrawn:

28/11/2025

Reference Number: BAN-25-OOL-0049

INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (SECTION 30)

Name of Applicant:

OPEC Pty Ltd

Description of Proposed Activity:

Stage 1 - BP - Demolition Works 1) Demolition and removal of the existing ARFF boat shed. 2) Site clean and construction area make good post demolition works. 3) 3 X temporary site storage containers used for removal of building materials from site limited to 1 week duration.

Location of Proposed Activity:

ARFF station – Shed Demolition

If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:

N/A

If GCAPL is not the applicant, Date on which GCAPL received Application:

25/09/2025

INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (SECTION 31)

Date on which GCAPL made its determination:

N/A

How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):

Approval

Date on which the ABC made its determination / Date on which application withdrawn:

28/11/2025

Reference Number: BAN-25-OOL-0032

INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (SECTION 30)

Name of Applicant:

Digital Dental Clinic Fitout – Internal Renovation

Description of Proposed Activity:

Digital Dental Clinic Fitout – Internal Renovation

Location of Proposed Activity:

Airport Central, Building D, Tenancy 10-12, Eastern Avenue, Bilinga QLD 4226

If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:

N/A

If GCAPL is not the applicant, Date on which GCAPL received Application:

3/07/2025

INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (SECTION 31)

Date on which GCAPL made its determination:

N/A

How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):

Approval

Date on which the ABC made its determination / Date on which application withdrawn:

2/02/2026

Reference Number: BAN-25-OOL-0027

INFORMATION ABOUT BUILDING APPLICATIONS LODGED WITH THE ABC (SECTION 30)

Name of Applicant:

ARFF – Install Temporary Dorm

Description of Proposed Activity:

Installation of temporary dormitories, covered walkway and services (Electrical, Stormwater, Smoke Detection and Crash Alarms)

Location of Proposed Activity:

Air Services Australia Aviation Rescue Fire Fighting site

If GCAPL is the Applicant, Date on which GCAPL Lodged with the ABC:

N/A

If GCAPL is not the applicant, Date on which GCAPL received Application:

04/06/2025

INFORMATION ABOUT DECISIONS BY GOLD COAST AIRPORT PTY LTD AND THE AIRPORT BUILDING CONTROLLER ON BUILDING APPLICATIONS (SECTION 31)

Date on which GCAPL made its determination:

N/A

How did the ABC deal with the application? (i.e Consent, Refusal, Deemed Refusal, Withdrawal):

Approval

Date on which the ABC made its determination / Date on which application withdrawn:

05/02/2026

Showing 15 of 184 results